Steam line & outside line piping upgrade

Job Completed | Steam Line & Outside Line Piping Upgrade

Another successful project completed by the Boilercraft Africa team.
The existing corroded and deteriorated piping was removed and replaced with newly fabricated and installed piping on both the steam line and outside line.

The completed upgrade provides a safer, cleaner and more reliable installation, helping to improve operational performance and long-term durability.

Bringing this boiler back to life

Phase 3 of this boiler refurbishment is well underway, with the Boilercraft Africa team completing extensive lagging and cladding work to restore its protection, performance and appearance.

The existing lagging and cladding have been removed, the boiler shell has been cleaned and prepared, and new protective components are being fabricated and installed.

This boiler is undergoing a complete transformation, and we look forward to revealing the finished result.

Steam Line & Condensate Line Installation

Project Completed | Steam Line & Condensate Line Installation

We are pleased to confirm the successful completion of this steam line and condensate line installation.

The new line has been professionally installed with stainless-steel lagging and cladding, providing a neat, durable finish while protecting the system and supporting reliable long-term performance.

Refurbishment

At BoilerCraft Africa, every project is handled with care, expertise, and commitment to excellence. Here, our team successfully loads and positions a fully refurbished industrial boiler, ensuring it’s ready to deliver reliable steam solutions for years to come.
From design to installation, we provide end-to-end boiler solutions built around efficiency, safety, and long-term performance.
🚀 Powering industries.
⚙️ Delivering reliability.
🔥 Crafting steam with precision.

Enroute for a refurbishment. She’s coming back stronger.

Our team was called out to assess serious damage caused by a failed solenoid valve, which led to latent fuel buildup and extreme heat in the furnace extension. This caused the refractory lining to collapse, blocking the furnace path and resulting in flame impingement on the boiler’s front door and shell.